As part of the Channel Tunnel Rail Link's last phase, the station will be moved to underneath St. Pancras station, the old site closing in 2007. The new location will serve the Thameslink 2000 route (upgraded from the original Thameslink), have the ability to take 12-carriage trains, and will have much better links with both King's Cross and St. Pancras. The original station is planned to be closed for approximately six months from September 2004.
External links