Given a schedule H
We have a lost update. Any attempts to make this schedule serial would give off two different results (Either T1's version of A/B is shown, or T2's version of A and B is shown.), and would not be the same as the above schedule. This schedule would not be serializable.
Strict 2PL, overcomes this inconsistency by locking T1 out from B. Unfortunately, deadlocks is something Strict 2PL does not overcome all the time.
See also: